The northeastern Inscription Wall panels and capstones are completely installed and the John Stevens Shop of Rhode Island is in the process of sandblasting and engraving Dr. King’s quotes. About 25% of the wall panels have been installed on the southwestern wall. All the curb stones have been set around the northeast landscape kindney and along the entrance to the northeast. The granite pavers are being set in the NE corner of the site. The layout for the Stone of Hope and Mountain of Despair has been completed, and the large red crane at the top of the image is on site specifically for the installation of the large granite pieces of the sculptures. At the auxiliary building, the steel work and the roofing structure have been installed, the plumbing and mechanical work has started, and the electrical wiring is being installed.