The mock up is completed. The location for the relocated West Basin Drive is being excavated. A large portion of the fountain tunnel has been poured, the slab for the Stone of Hope has been poured, and one third of the plaza slab has been poured. A large section of rebar has been laid in the plaza slab in preparation for the next concrete pour.